Upgrading of Naphtha Catalytic Desulphurization with Hydrogen

Upgrading of Naphtha Catalytic Desulphurization with Hydrogen

Client:
HELLENIC PETROLEUM S.A. - ASPROPYRGOS INDUSTRIAL COMPLEX
Status:
Completed
Country:
Greece
Business Area:
Oil
Solution/Service:
Studies,Project Management Services
Completion Year:
2005
Category:
Refineries

Technical Data

  • Preparation of Process data sheets for a new analyzer regarding the input/output sections of the Tower
  • Simulation of N-2201X Tower for the optimum position of two new thermometers
  • Replacement and re-dimensioning of certain equipment
  • Connection to Flare

Our Services

  • Basic Design,
  • Detailed Engineering
  • Project Management
  • Issue of Material Requisitions
  • Issue of Technical & Commercial Volumes ITB for erection works
  • Cost Estimation & Procurement Services
  • Project Control Services
  • Construction Supervision Services

Description

For the upgrade of Unit U-2200, Asprofos performed a simulation of the main Tower in order to identify the optimum position for the installation of two new thermometers for the APC (Advanced Process Control) system. Process Data Sheets were prepared for new analyzers in the input and output sections of the Tower. The shell of the reboiler had to be replaced and the M-5132 heat exchanger redimensioned and consequently relevant material requisitions for procurement were also prepared. A connection to the Flare system was also designed and built.