Thessaloniki - Skopje 16 inch Crude Oil Pipeline

Thessaloniki - Skopje 16 inch Crude Oil Pipeline

Client:
ELPET BALKANIKI S.A.
Status:
Completed
Country:
Greece
Business Area:
Oil
Solution/Service:
Studies,Project Management Services
Completion Year:
2003
Category:
Oil Pipelines

Our Services

  • Construction Supervision
  • Commissioning / Start-up of Crude Oil Pipeline and associated Terminal Stations
  • Detailed Design Follow-up, including review of Contractor’s pertinent Engineering Activities (Drawings/ Documents included)
  • Technical Support to the Owner
  • Contract Administration
  • Project Management (Project Control services, monitoring of the project time schedule and the associated cash flow)
  • Issue of Technical Specifications Study associated with a Channel for Telecommunication Cables

Description

The scope of the project was to deliver a Pipeline system for crude oil Transport between Helpe TIC and OKTA Skopje Refinery.

ASPROFOS carried out the full detailed design follow-up and provided services pertaining to procurement, construction supervision, testing and commissioning. Construction of the crude oil pipeline provided interconnection between new tankage within HEL.PE/T.I.C. (2 tanks of 80,000 m3 capacity each) to existing crude oil tankage within OKTA refinery. The 16 inch pipeline extends along a distance of 213 km, has a design pressure of 102 barg and is designed to transport 2.5 million tons per year of various crude oils to OKTA.