New White Products Pipelines Interconnecting Aspropyrgos Industrial Complex with Elefsis Industrial Complex & Upgrade of Existing Attica Western Suburban Railway Section
New White Products Pipelines Interconnecting Aspropyrgos Industrial Complex with Elefsis Industrial Complex & Upgrade of Existing Attica Western Suburban Railway Section
Client:
HELLENIC PETROLEUM - ASPROPYRGOS INDUSTRIAL COMPLEX
Business Area:
Oil,Industry & Infrastructure
Solution/Service:
Studies
Category:
Oil pipelines, Infrastructure
Technical Data
(i) Pipelines (Length 10.5km each)
- Diameter: 1 x 16-inch – white products
- Diameter: 1 x 16-inch : crude oil
- Diameter: 1 x 10-inch LPG (optional)
- Τοποθέτηση εντός θεσμοθετημένης ζώνης διέλευσης ΟΣΕ
- Bidirectional products transfer
- Installation of Scraper Stations at AIC (2) and EIC (2)
- Interconnection between AIC and EIC
- Cathodic Protection system
- Fiber optic able Καλώδιο (2 routes)
- Leak Detection System
- Branch connection with crude oil tanks at AIC
- For further investigation
- prediction for new metering system installation
- prediction for new pumps installation
(ii) Railway Line Project
- Modification and Installation of existing quadruple railway line to double at Railway Control Station of Acharnon
- Installation of double railway line between Railway Control Station of Acharnon to AIC
- Installation of single railway line between AIC and EIC
- Installation of single railway line between EIC – Megara Terminal Station
- Foundation of electric poles (every 40-50 m)
- Placement of signs
- Channel Installation for railway cables
- Excavations according to ERGOSE S.A. specifications.
Our Services
- Detailed Engineering
- Budget and Cost Estimation
- Basic Design
- Construction Supervision
- Project Management Services
Description
Preparation and management services of all the required studies for the project New White Products pipeline interconnection between Elefsis Industrial Complex and Aspropyrgos Industrial Complex, including the studies for the railway connection between Railway Control Station of Acharnon and Megara (Railway Project).
The project is running in two phases:
Phase [1]
- Basic Design and detailed engineering of pipelines and their interconnections at Aspropyrgos Industrial Complex and Elefsis Industrial Complex
- Railway Study for the itinerary Railway Control Station of Acharnon –Megara
- Permitting Engineering and Environmental study for the pipelines and railway study (bundling principle)
- ITB preparation
- Review of Railway study with ERGOSE S.A.
Phase-[2]
- Technical Support to the customer for the evaluation of the EPC contractors (bidders)
- Construction supervision for the pipelines section of the project