New Natural Gas Installation Section Inside Elefsis Refinery

New Natural Gas Installation Section Inside Elefsis Refinery

Client:
HELLENIC PETROLEUM S.A. - ELEFSIS INDUSTRIAL COMPLEX
Status:
Completed
Country:
Greece
Business Area:
Natural Gas
Solution/Service:
Studies,Project Management Services
Completion Year:
2015
Category:
High & Medium Pressure Pipelines

Technical Data

  • Natural Gas Supply: 47,300 Nm3 / hr
  • Minimum Operating Pressure: 25kg/cm2g
  • Design Pressure: 80kg/cm2g
  • Operating Temperature: 3°C - 22°C
  • Design Temperature: 50°C

Our Services

  • Project Management
  • Detailed Engineering
  • Project Control
  • Cost Estimation
  • Issue of Technical and Commercial Volumes for erection works

Description

The project concerns the feed installation through a 12” diameter above ground Natural Gas pipeline with a total length of 3 km at the Elefsis Industrial Complex. The pipeline starts from the exit valve of a metering station and was connected to the new fuel gas network of the Industrial Complex ending at the new hydrogen unit. The non - stop operation of hydrogen production was ensured with the installation of a centrifugal compressor and a ‘’Knock-out drum’’, while an air cooler was designed to maintain the cooling of the compressor recirculation and the regulation of the production which was achieved with the aid of a skid mounted unit. HALDOR TOPSΟE, the Licensor of the Hydrogen Unit assisted in the development of the basic design for the new requirements.