Τhe main concept of this project was the conversion of various loading positions within the Station, increasing on one hand the number of bottom filling positions in the tank trucks, while on the other to increase the ability of loading more than one product simultaneously. In this manner the number of trucks to be loaded was increased while the queue line waiting time for the filling procedure was decreased. The Loading Station was supplied with ACCULOAD meters, while the safety equipment as well as the relevant software was upgraded to meet the new requirements.