LNG Terminal at Revithoussa Island

LNG Terminal at Revithoussa Island

Client:
PUBLIC GAS CORPORATION (DEPA S.A), HELLENIC GAS TRANSMISSION SYSTEM OPERATOR (DESFA S.A)
Status:
Completed
Country:
Greece
Business Area:
Environment
Solution/Service:
Project Management Services,Technical Consulting
Completion Year:
2014
Category:
Environmental Consulting Services, Permit Engineering

Technical Data

  • Size: 130.000 m3 LNG storage capacity
  • 3rd Tank Expansion + 95.000 m3
  • Cogeneration Power Unit: 13 MWe

Our Services

  • Stakeholders Engagement and Permits Acquisition
  • Specialized Seismic Studies
  • Safety Study
  • Environmental Impact Assessments (incl. Initial 2 tanks and expansion, Land reclamation works, Power generation plant, Cumulative Impacts Report for EBRD)
  • Wastes Management Study (Liquid and Solid)
  • Oceanic Study for Dispersion of Cold Water
  • Air Dispersion Model
  • Construction Management and Supervision
  • Services on Quality Matters
  • Close Out Activities
  • Final Documentation packages

Description

ASPROFOS was engaged in the establishment of the first LNG Terminal in Greece from the very beginning of the project. Specifically for environmental and permit engineering services, ASPROFOS prepared the all the relevant application packages and studies for environmental licensing of all the facilities of the Terminal.

 