Installation and interconnecting of new Isomerization Gases Methanator Unit and Support Services for EPC Contractor in Thessaloniki Industrial Complex

Installation and interconnecting of new Isomerization Gases Methanator Unit and Support Services for EPC Contractor in Thessaloniki Industrial Complex

Client:
HELLENIC PETROLEUM - THESSALONIKI INDUSTRIAL COMPLEX
Status:
Completed
Country:
Greece
Business Area:
Oil
Solution/Service:
Studies,Project Management Services
Completion Year:
2017
Category:
Refineries

Technical Data

The Methanator Unit treats the gas feed to Isomerization Unit, so that the CO will be transferred to methane and water thus absorbing the CO from the feed that deactivates the isomerization catalyst. This Methanator Unit was designed as a package item skid mounted in one or more pieces. The project scope included the installation and interconnecting of new isomerization gases methanator unit. Specifically: Basic & Detailed Desing of interconnecting and support equipment, New methanator skid plot plan, Participation in HAZOP study.

Our Services

  • Detailed Engineering
  • Basic Design
  • Project Management Services
  • Technical Support
  • Design Review

Description

In the framework of the Project of the new Methanator Unit, the design of which has been undertaken by Axens, the need has arisen to install a lube oil removal container from the process gas.

Change cookies consent Revoke cookies consent