Front End Engineering Design (FEED) for the new Small Scale Infrastructure at Revithoussa Terminal LNG
Front End Engineering Design (FEED) for the new Small Scale Infrastructure at Revithoussa Terminal LNG
Client:
DESFA S.A. (HELLENIC GAS TRANSMISSION SYSTEM OPERATOR S.A.)
Business Area:
Natural Gas
Solution/Service:
Studies,Licensing & Environmental Services
Technical Data
FEED-1
- Preparation of the following documents:
- Project Management
- Piping
- Civil
- Geological & Geotechnical
- Instrumentation
- Electrical
- Health & Safety
- Progress Reports
- Mooring Analysis
- Process Analysis (PFDs, EFDs, Data Sheets)
- Equipment, Line and Tie-ins - List
- Mechanical Equipment
- Permitting Engineering and Contact with Authorities
- Environmental and Social Impact Assessment
- Special Studies (Air Quality, Noise, benthic, Met-Ocean, Traffic, Ballast Water Management Philosophy)
- EPC’s Cost Estimation Report, Scope of Work, Execution Schedule
FEED-2
- Preparation of following documents:
- Project Management
- Piping (Material Selection)
- Geological and Geotechnical
- Instrumentation
- Electrical
- Health and Safety
- Evaluation Report for existing quay modifications
- Mooring Analysis
- Process Analysis (PFDs, EFDs, Data Sheets)
- Equipment, Line and Tie-ins List
- Ballast Water Management Philosophy
Our Services
- Basic Design
- Project Management Services
Description
Elaboration of two (2) FEED studies and production of all appropriate documentation necessary for application, at later stage, by an EPC Contractor, which shall perform the detailed engineering, construction and pre-commissioning of a New Small Scale LNG infrastructure at Revithoussa Terminal of DESFA adequate of accepting LNG carriers with capacity from 1,000m3 up to 20,000m3. The PROJECT was consisted of the following parts:
- FEED-1: New Maritime infrastructure at the northeastern side of Revithoussa: a new pile jetty having an overall length of about 180m that will be installed along the northeast side of Revithoussa isle. The jetty will be perpendicular to the coast, allowing the berthing of two (2) LNG carriers at the same time. Minimum sea depth of 11m shall be guaranteed to host LNG carriers with capacity up to 20,000m3.
- FEED-2: Main interventions at the southern side of Revithoussa (existing quay-wall): mooring arrangements necessary to receive all LNG carriers with capacity from 1,000m3 up to 20,000m3 and at both conditions: (a) full loaded and (b) ballast conditions.