Extension of two Substations at Megara Installations

Extension of two Substations at Megara Installations

Client:
HELLENIC PETROLEUM S.A.
Status:
Completed
Country:
Greece
Business Area:
Power
Solution/Service:
Studies
Completion Year:
2000
Category:
Distribution

Technical Data

ASPROFOS was awarded the revamping of two (2) electrical substations located at the HELPE Installations at Megara.

Our Services

  • Detailed Engineering Documentation necessary for Revamping works
    • Material Requisitions for :
      • 21 kv switchgear
      • 6 kv switchgear disconnector
      • Power centers
      • Auxiliary Service Boards (ASB)
      • Essential Loads Panels (ELP)
      • Battery charger, DC Battery Set, 110vDC Board
      • Marshalling Box MB/ES
      • Static Capacitors
      • Low & Medium Voltage Surge Arresters
      • Low & Medium Voltage power cables
      • Fire Alarm System, Lighting Panel, Alarm Panel
      • Erection Requisition of the Works
    • Technical and Commercial Evaluation for:
      • Low Voltage Cables
      • Power Centers
      • Panels etc
    • Construction Supervision Services of :
      • Dismantling old equipment
      • New power & control cable layout
      • Connecting power & control cables from old SWGD to the new ones

Description

Since the electrical substations at Megara were considered old, Owner decided to upgrade them by replacing all switch gear and cabling. Aspofos was involved in this Project in order to facilitate Owner in the materialization of this decision and provided project management, basic design, construction supervision services, ITB preparation and project control services.