Engineering Consultant for FEED of Trans Adriatic Pipeline (TAP) East Section & Interconnecting with Kipi
Engineering Consultant for FEED of Trans Adriatic Pipeline (TAP) East Section & Interconnecting with Kipi
Client:
E.ON NEW BUILD & TECHNOLOGY GmbH
Business Area:
Natural Gas
Solution/Service:
Studies,Licensing & Environmental Services
Category:
High & Medium Pressure Pipelines
Technical Data
- High Pressure Pipeline KIPI (GREEK / TURKISH BORDER) – NEA MESSIMVRIA
- Diameter 48" underground, piggable, cathodically protected steel pipeline with design lifetime of 50 years
- Total Length of TAP- (Greek Section) : 563 km
- Pipeline Length in ASPROFOS Scope of Work : 380 km
- Design Pressure: 95 barg
- Initial Capacity Transfer: 10 bcm/year
- Fourteen (14) unmanned valve stations at 30 km intervals
- One (1) Compressor Station at Kipi 30-45 MW with two (2) operating and one (1) spare unit of 15 MW each
- A permanent 8m Pipeline Protection Strip will be maintained
- Future Capacity Transfer 20 bcm/year
bcm: billion cubic meters
Our Services
- Basic Design
- Cost and Budget Estimation
- Survey Reports
- Topographical Plans for Block Valve Stations
- Topographical Drawings (Recording, Longitudinal, Cadastral) for all Crossings (Railways, Highways, National Roads, Provincial Roads, Asphalt Roads, Streams, Rivers, Ravines, Irrigation Channels etc)
- Evaluation Report
- Geological Maps
- Geotechnical Survey and Soil Investigation Reports
- Hydrological Studies and Protection Measures
- Pipeline Route Maps
- Supplementary Design Reports