Engineering Consultant for FEED of Trans Adriatic Pipeline (TAP) East Section & Interconnecting with Kipi

Engineering Consultant for FEED of Trans Adriatic Pipeline (TAP) East Section & Interconnecting with Kipi

Client:
E.ON NEW BUILD & TECHNOLOGY GmbH
Status:
Completed
Country:
Greece
Business Area:
Natural Gas
Solution/Service:
Studies,Licensing & Environmental Services
Completion Year:
2014
Category:
High & Medium Pressure Pipelines

Technical Data

  • High Pressure Pipeline KIPI (GREEK / TURKISH BORDER) – NEA MESSIMVRIA
  • Diameter 48" underground, piggable, cathodically protected steel pipeline with design lifetime of 50 years
  • Total Length of TAP- (Greek Section) : 563 km
  • Pipeline Length in ASPROFOS Scope of Work : 380 km
  • Design Pressure: 95 barg
  • Initial Capacity Transfer: 10 bcm/year
  • Fourteen (14) unmanned valve stations at 30 km intervals
  • One (1) Compressor Station at Kipi 30-45 MW with two (2) operating and one (1) spare unit of 15 MW each
  • A permanent 8m Pipeline Protection Strip will be maintained
  • Future Capacity Transfer 20 bcm/year

bcm: billion cubic meters

Our Services

  • Basic Design
  • Cost and Budget Estimation
  • Survey Reports
  • Topographical Plans for Block Valve Stations
  • Topographical Drawings (Recording, Longitudinal, Cadastral) for all Crossings (Railways, Highways, National Roads, Provincial Roads, Asphalt Roads, Streams, Rivers, Ravines, Irrigation Channels etc)
  • Evaluation Report
  • Geological Maps
  • Geotechnical Survey and Soil Investigation Reports
  • Hydrological Studies and Protection Measures
  • Pipeline Route Maps
  • Supplementary Design Reports