Technical Data

  •  Architectural study for the new substation
  • Electrical study for the new substation and its equipment.
  • Geotechnical study for the new substation
  • HVAC and Civil engineering study for the new building of the substation.
  • Material Requisition for the supply of cables, panels, luminaires, etc
  • Technical evaluation of bids for the procurement of the materials
  • ITB for construction
  • Technical evaluation of the contractors
  • Estimation of procurement and construction
  • Issuance of all required permits (Fire Protection, Construction, Operation)

Our Services

  • Detailed Engineering
  • Budget and Cost Estimation
  • Project Management Services

Description

The scope of work is the detail design and procurement services for the supply of the new substation R-7700 at Aspropyrgos Industrial Complex. The new needs that require the construction of a new substation at the Aspropyrgos Industrial Complex are (indicative):

  • additional consumption due to new LPG tanks,
  • degradation of the existing substations and
  • future estimated Medium Voltage needs.
    In more detail, this project includes:
  • Preparation of studies (Electrical / Architecture / Geotechnical / Civil Engineering)
  • Procurement Services (ITB preparation, Technical Evaluations, Follow up)
  • Field work - Contracting