CDU-III Revamps & Existing Units Modifications

CDU-III Revamps & Existing Units Modifications

Client:
HELLENIC PETROLEUM S.A. - ELEFSIS INDUSTRIAL COMPLEX
Status:
Completed
Country:
Greece
Business Area:
Oil
Solution/Service:
Studies,Project Management Services
Completion Year:
2013
Category:
Refineries

Technical Data

  • CDU III & CDU IV REVAMPING

Our Services

  • Project Management
  • Basic Design
  • Detailed Engineering
  • Project Control
  • Cost Estimation
  • Issue of Technical and Commercial Volumes for erection works

Description

An extensive revamping of the existing units CDU-III and CDU-IV was performed. The modifications were expanded to other existing units as well, namely:

  • Replacement of existing crude-oil Heater.
  • New fuel-oil system installation in CDU-IV area.
  • Caustic neutralization package installation in CDU-III area
  • Local modifications in CDU-IV including two new pumps installation.
  • New arrangement in CDU-III cooling and transportation of the desalter brine to new waste water treatment unit
  • Interconnections to HDS Unit and Boiler House including minor modifications and two desuperheaters installation.