Biogas Power Plant 4.6 MW at Tychero

Biogas Power Plant 4.6 MW at Tychero

Client:
HELPE RENEWABLES S.A.
Status:
Completed
Country:
Greece
Business Area:
Environment
Solution/Service:
Studies,Project Management Services
Completion Year:
2013
Category:
Environmental Consulting Services, Permit Engineering

Technical Data

  • Size: 4.68 MW
  • Operational Time: 8,000 h/year → 37,472 MWh/year
  • Biomass Consumption 44,500 tn/year

Our Services

  • Contact with Authorities
  • Compatibility with Special Physical Planning for Renewable Energy Sources Projects
  • Baseline data collection activities, incl.
  • Abiotic parameters (air, water, soil, landscape)
  • Biodiversity (flora and fauna) surveys
  • Environmental and Social Impact Assessment
  • Forest Characterization Application File
  • Follow up of Environmental Terms Application

Description

ASPROFOS prepared the Environmental Impact Assessment and the necessary Forest Characterization Act File. We elaborated the Compatibility with Special Physical Planning for Renewable Energy Sources Projects, performed all necessary baseline data collection activities and of course we were responsible for contact with Authorities, and Follow up of Environmental Terms Application