Amine Unit Installation

Amine Unit Installation

Client:
INA INDUSTRIJA NAFTE D.D. (INA D.D.)
Status:
Completed
Country:
Croatia
Business Area:
Oil
Solution/Service:
Studies
Completion Year:
2016
Category:
Refineries

Technical Data

  • Amine Unit Installation at LPG MEROX

Our Services

  • Project Management
  • Basic Engineering
  • Detailed Engineering
  • Project Control Services

Description

INA is the leading Croatian Oil and Gas Company operating two refineries in Croatia in Rijeka and Sisak. The purpose of this project was to:

  • Install of an AMINE UNIT before LPG MEROX Unit (to treat the LPG before Merox, in order to reduce LPG H2S content and therefore to reduce soda consumption and soda contained waste water.
  • To route the fuel gas from Naphtha Hydrotreater 2 to FCC amine unit directly though the new pipeline coming from the CDU.

H2S removed from LPG sweetening unitwas designed to be sent to the existing Claus Unit for sulfur recovery. The treated LPG from the LPG sweetening was sent to the existing Merox 5 unit fro further sweetening.

 