71 Km High Pressure Natural Gas Pipeline - Ampelia-Trikala - Karditsa
71 Km High Pressure Natural Gas Pipeline - Ampelia-Trikala - Karditsa
Client:
PUBLIC GAS CORPORATION (DEPA S.A)
Business Area:
Natural Gas
Solution/Service:
Studies,Project Management Services
Category:
High & Medium Pressure Pipelines
Technical Data
High Pressure Pipeline AMBELIA - TRIKALA - KARDITSA
- Diameter 10” underground, cathodically protected steel pipeline
- Total length: 71 km
- Design pressure: 70 barg
- One 10” Scrapper Launcher at Ambelia O & M Building
- One 10” line valve station along the pipeline at Ambelia
- One 10" line valve station together with M/R station at Karditsa
- One 10" scraper receiver station together with M/R station at Trikala
- HDPE conduit 40 mm outside diameter along the pipeline route for the insertion of the fibre optic cable
- Electrical, instrumentation, telecommunication and SCADA system (including LMR).
- Access roads for the above stations
Our Services
Basic Design and Environmental Impacts Assessment Study for High Pressure Natural Gas Pipeline AMBELIA - TRIKALA - KARDITSA.
- Project Management:
- Preparation of Quality Plan,
- Detailed project Schedule, planned progress curve
- Engineering Document Register (EDR)
- Cost Estimation Report and Monthly progress Report
- Coordination and monitoring of all engineering activities
- Follow the progress of the project, intervening when corrective actions need to be implemented to avoid divergence from the requirements set out in the EPC Contract
- Basic Design:
- Determination of the optimum routing, following feasibility studies of various schemes devised
- Preparation of Process Flow Sheets and P&IDs for pipeline sections, Line Valve Stations, Scraper traps, etc.
- Preparation of data sheets and Specifications for all instrumentation and peripherals
Description
ASPROFOS prepared the Basic Engineering Design and the Environmental Impacts Assessment Study (EIA) for the High Pressure Natural Gas pipeline along the route Ambelia - Karditsa - Trikala, which was planned by the Hellenic Gas Transmission System Operator (DESFA S.A.) in order to supply the region of Central Greece with natural gas. Detailed engineering and finally, the construction of the pipeline system and the associated gas facilities were based onASPROFOS' Basic design.