390MW Power Production Unit
390MW Power Production Unit
Client:
THESSALONIKH POWER, ELPEDISON
Business Area:
Environment
Solution/Service:
Studies,Project Management Services
Category:
Environmental Consulting Services, Permit Engineering
Technical Data
390 MWe Combined Cycle Power Plant
Our Services
- Permits Acquisition
- Specialized Seismic Studies
- Safety Study
- Environmental Impact Assessment
- Air Dispersion Model
- Wastes Management Study (Liquid and Solid)
- Thermal Plume Dispersion Model – Air and Water
- ESIA Consultation and Public Disclosure
Description
ASPROFOS prepared the Environmental and Social Impact Assessment, in collaboration with external experts which prepared the necessary supporting models.